|
The Makings of a New Basement
| How the building used to look.
|
| This is how the front looks in preparation for remodeling.
|
| This is how the back used to look.
|
| This is how the back looks in preparation for remodeling.
|
| How the basement looked ten months ago.
|
| This is how the basement looks in preparation for demolition.
|
After a day-and-a-half of work, the church is up in the air!
The digging is finished just in time for the rainy weekend.
Footings and drain-tile to keep us solid and dry.
The walls are poured. Soon the forms will be removed.
With the forms removed, it won't be long before the church comes back down.
| The single front door will be made wider, but not as wide as the opening.
|
| Now it is evident where the windows will be installed.
|
| A new back door will be installed just left of center.
|
The church is down; and hopefully for a long, long time!
There has been a lot of progress, though mostly on the inside.
| We'll be pink for a while, but we'll be warm for a long time.
|
| The windows are installed.
|
| Father and son begin constructing the stairway.
|
| Stephen, Scott and Ron have plenty of inside work to do.
|
| Ron and Julian are keeping plenty busy.
|
|